Using finite element method, the soil temperature field around the buried hot oil pipeline during starting transportation was calculated numerically. Then the time for oil was identified precisely. The results show that 20 h after preheating for oil can be in line with the requirement. The results are in accordance with engineering. A reliable theoretical basis is provided for hot oil pipeline to operate economically and securely through applying the technology.